Skip to content
Taking requests from Maple Valley, WA and the lake neighborhoods

Does a Maple Valley Drywell Count as an Ecology UIC Well?

A Maple Valley drywell, a UIC well under Washington's rule, stays one even when it takes nothing but roof water from a single-family home. What changes is the paperwork: a roof-runoff-only well at a house doesn't have to register with Ecology.

What Ecology calls an injection well

The Department of Ecology runs the Underground Injection Control program. The program page describes injection wells as "structures built to allow fluids to flow into the ground." It says the most common ones in Washington "are known as drywells."

The same page says most of the state's injection wells handle stormwater "from roads, parking areas, and roofs." It also lists sump pumps as an example of an injection well. For anyone with a pump in a crawl space pit, that line is worth reading twice.

The program enforces Chapter 173-218 WAC. The rule has sections on definitions, exemptions, registration and a groundwater standard, and the rest of this post walks through those four in order.

Maple Valley drywell, UIC well: what the definitions say

WAC 173-218-030 defines a UIC well as "a well that is used to discharge fluids into the subsurface." It then names three shapes. The first is "a bored, drilled or driven shaft, or dug hole whose depth is greater than the largest surface dimension." The second is an improved sinkhole. The third is a subsurface fluid distribution system, which the rule calls "an assemblage of perforated pipes, drain tiles, or other similar mechanisms intended to distribute fluids below the surface of the ground."

The same section defines a drywell as a well "completed above the water table" so that "its bottom and sides are typically dry except when receiving fluids." Most backyard drywells fit that description: a buried chamber or rock-filled pit that sits dry until a storm fills it.

So the definition doesn't depend on what the water is, how much there is, or who owns the house. It depends on the structure. A hole deeper than it is wide that lets water into the ground, or a run of perforated pipe meant to spread it underground, meets the shape test.

What the rule leaves out of UIC status

WAC 173-218-050 is titled "Exemptions from UIC well status." It lists structures that "are not considered UIC wells and are not regulated under this chapter." These are the items on it:

Not a UIC well under WAC 173-218-050Condition in the rule
Single-family residential septic systemsHandling only sanitary wastes, under the rule's size limits
Nonresidential septic systems and cesspoolsSame sanitary-only and size limits
Holes not used to place fluids undergroundAny dug, blasted, drilled or bored hole used for something else
Infiltration ponds, dispersion systems, trenchesOnly if the trench has no perforated pipe
Storm drain components with perforated pipeOnly if built to carry water to a surface water body

A roof-runoff drywell at a house isn't on that list. Neither is a gravel trench with perforated pipe that soaks water into the yard. Those stay UIC wells. The break they get comes in a different section, and it covers registration only.

The registration break for single-family homes

WAC 173-218-070 starts with the general duty: "The UIC well owner or operator must register the UIC well with the department," and "the wells only need to be registered once."

Subsection (1)(e) carves out the house case: "UIC wells at single-family homes that only receive residential roof runoff, or are used to control basement flooding," "do not have to register with the department."

Ecology's registration requirements page says the same thing in plain words: "You do not need to register the type of injection well you would use at home to collect residential roof-runoff." The program page extends the trench exemption to "only roof runoff from single family homes or duplexes." For everyone else, the registration page is direct: "All owners must register their wells before use." It adds that "There is no fee to register injection wells."

Notice the word "only" in the rule. The roof-runoff exemption is written for a well that receives roof water and nothing else.

Skipping registration doesn't skip the groundwater standard

A well can be "rule-authorized," which is how most of them operate. The registration page says "The majority of the injection wells in Washington are rule-authorized." Section 070 sets the bar: "In order to receive rule authorization, your well must meet the nonendangerment standard."

WAC 173-218-080 states that standard: "To meet the nonendangerment standard you must prevent the movement of fluid containing any contaminant into the groundwater." The sentence goes on to tie it to the state's groundwater quality rules. Section 070 adds that "Rule authorization can be rescinded if a UIC well no longer meets the nonendangerment standard of this chapter."

So a roof-only drywell at a house is excused from the registration form, not from the reason the rule exists. What goes into it still matters.

Why the City of Maple Valley cares about infiltration

The City runs its own storm and surface water program. Its page tells owners how "To complete and record a Declaration of Covenant for a privately maintained stormwater management system." The same page says "All stormwater systems that infiltrated to soils underground are generally required to be registered" as "Underground Injection Control Wells (UICs) by the Department of Ecology."

The City's 2024 Comprehensive Plan explains why infiltration gets that attention here. Its Environmental Quality element (EQ-8) says almost half of the city's runoff goes to infiltration facilities. It also says about 50% of the city is highly susceptible to groundwater contamination because the Vashon till is absent there.

On that half of the city, water poured into a drywell meets looser ground on its way down. That is good for soaking in and less forgiving for anything carried along with it. The Ecology standard and the City covenant both rest on that fact.

Where a crawl space line fits the question

The rule names two house cases: roof runoff only, and wells used to control basement flooding. Water pumped out of a crawl space pit is neither roof water nor, in plain terms, a basement. It is usually groundwater or seepage that has collected under the floor.

Whether tying a crawl space pump into an existing roof drywell changes how the rule treats that well is not something I will answer for you here. It is a question to put to Ecology's UIC program and the City's surface water staff before a pipe is connected. Ask in writing and keep the reply.

There are building reasons to slow down too. A drywell sized for roof water at one house may not have room for a pump that cycles through a wet month. When a drywell fills and can't drain, water backs up through the pipes feeding it, and the nearest low point is often the crawl space the pump was meant to keep dry. A new discharge may also cross a stormwater system the covenant puts in someone's care.

What you can check yourself

You can do most of the groundwork before calling anyone.

  1. Search Ecology's well records. The UIC well search lets you look up registered wells by site name, owner, address, city or county. A roof-only well at a house may not appear, since it isn't required to register.
  2. Find out whether a covenant applies. If your lot is part of a plat with private stormwater facilities, the City's surface water page is the place to start asking about the recorded Declaration of Covenant.
  3. Sketch what drains where. Walk the yard and the crawl space and draw each pipe you can see: gutters to drywell, any footing drain outlet, any pump discharge. Mark where each one ends.
  4. Read the rule sections yourself. Sections 030, 050, 070 and 080 are short, and your sketch will tell you which one applies to each line.

When it becomes crawl space work

The drywell question usually surfaces because something under the house is wet. Start with a sketch: where the water comes from, where it goes now, and where it is allowed to go. Ask the contractor to photograph each connection so the answer from Ecology and the City has something concrete to respond to.

If water is reaching the crawl space, the fix is a crawl space drainage plan whose discharge point has been settled first, not improvised. Once the ground is managed, crawl space encapsulation or a vapor barrier deals with the moisture that rises from the soil. For which jobs need a City permit and which need King County's, see the Maple Valley permits guide.

Soil changes the picture too. Lots on peat in low basins and yards on Alderwood hardpan take water very differently from the open gravel that makes infiltration easy.

Drywell and UIC well questions

Do I have to register a roof-runoff drywell at my Maple Valley house?

A drywell at a single-family home that receives only residential roof runoff does not have to register with Ecology under WAC 173-218-070(1)(e). It is still a UIC well, and to be rule-authorized it must meet the nonendangerment standard in WAC 173-218-080. If anything besides roof water goes into it, ask Ecology's UIC program whether the exemption still fits.

Is a gravel infiltration trench a UIC well?

That depends on whether it contains perforated pipe. WAC 173-218-050 says infiltration trenches without perforated pipe are not UIC wells. A trench built with perforated pipe meets the rule's definition of a subsurface fluid distribution system. Ecology's program page says those trenches must be registered unless they take only roof runoff from a single-family home or duplex, or control basement flooding.

Can I run a crawl space sump pump into my roof drywell?

Ecology and the City should answer that before the pipe is connected, because the roof-runoff exemption is written for wells that receive only roof water. Ecology lists sump pumps as an example of an injection well. Ask the UIC program and the City's surface water staff in writing, and check whether a recorded covenant governs the drywell.

What does the nonendangerment standard require?

The standard in WAC 173-218-080 requires you to prevent the movement of fluid containing any contaminant into the groundwater, measured against the state's groundwater quality rules. Every rule-authorized well has to meet it, registered or not. Section 070 says rule authorization can be rescinded if a well stops meeting the standard.

Ask before you connect

A Maple Valley drywell, a UIC well even when it holds nothing but rain off the roof, earns a few questions before any new pipe goes in. Find the covenant, read the four short rule sections, and get Ecology's and the City's answers in writing. Then plan the crawl space water around those answers.

Get referred to a local pro